Aerial view of a building site with cranes and foundations

General contractor since 1998

We build from the ground up

Homes, offices, halls and bridges. One team from the first dig to the day we hand you the keys.

Wexmoor Row, Bristol

01 / Selected work

Wexmoor Row

Type
Residential
Location
Bristol
Size
2,800 m²
Handed over
2025
Northgate Hall, Daventry

02 / Selected work

Northgate Hall

Type
Industrial
Location
Daventry
Size
18,500 m²
Handed over
2024
Keel River Crossing, Keel County

03 / Selected work

Keel River Crossing

Type
Civil
Location
Keel County
Size
212 m span
Handed over
2023
Albion House, Manchester

04 / Selected work

Albion House

Type
Commercial
Location
Manchester
Size
9,600 m²
Handed over
2024

28years

on site since 1998

340projects

handed over on time

1.2M m²

of floor space built

180people

on our own payroll

Who builds it

We are builders, not middlemen. Our own crews pour the concrete, raise the frame and close the envelope, so the people who price your job are the people who build it.

What we build

All services

01

New build

Houses, apartment blocks and offices, from foundations to finishes. We take the drawings and turn them into a building, with one site manager for the whole job.

02

Design and build

Bring us a plot and a budget. We bring the architect and engineers to the table early, so the design is priced and buildable before anyone signs.

03

Civil works

Bridges, retaining walls, roads and groundworks. Heavy plant, our own operators and a crew that knows how to work next to live traffic and water.

04

Refurbishment

Old buildings with new lives. We strip back, strengthen the structure and fit out while the neighbours keep their peace and the street stays open.

How a job runs

A typical eighteen month build, phase by phase. You get this chart in week one and an updated one every Friday.

01 Pre-construction

Survey, programme, price.

02 Groundworks

Dig, drain, foundations.

03 Structure

Frame, slabs, roof.

04 Envelope

Walls, windows, watertight.

05 Fit-out

Services, finishes, snagging.

06 Handover

Tests, keys, aftercare.

A site worker in a hard hat and high-visibility vest holding a concrete saw

Safety record

1412

days since our last lost-time injury. Every crew starts the day with a ten-minute briefing, and anyone on site can stop the work if something looks wrong.

  • ISO 9001 Quality
  • ISO 14001 Environment
  • ISO 45001 Health and safety
  • Constructionline Gold

“They told us the bad news early and the good news on time. The hall opened two weeks before our first lorry was due.”

Priya Ostrander, Operations director, Northgate Logistics

Built for

  • Northgate Logistics
  • Albescu Homes
  • Keel County Council
  • Wexmoor Housing
  • Albion Estates
  • Fenwright Rail